Cabinet Committee on Economic Affairs (CCEA) press release · 18 March 2026 · pibtracker filter

Cabinet approves construction of 4-Lane Access-Controlled National Highway-927 from Barabanki to Bahraich (101.515 km) in Uttar Pradesh on Hybrid Annuity Mode at a cost of Rs.6969.04 crore

PRID2241794 MinistryCabinet Committee on Economic Affairs (CCEA) Released Reading9 min

Posted On: 18 MAR 2026 4:10PM by PIB Delhi The Cabinet Committee on Economic Affairs chaired by the Prime Minister Shri Narendra Modi has approved construction of 4-Lane Access-Controlled National Highway-927 from Barabanki to Bahraich (101.515 km) in Uttar Pradesh on Hybrid Annuity Mode (HAM) at a cost of Rs.6969.04 crore. The proposed upgradation of the Barabanki&ndash;Bahraich section of NH-927 in Uttar Pradesh will address severe geometric deficiencies, sharp curves, and congestion in built-up areas across Barabanki and Bahraich district. Designed as an access-controlled 4-lane highway with continuous service roads, the project will bypass major habitations, increase average travel speeds, reduce travel time to about one hour, and improve overall road safety, fuel efficiency, and vehicle operating costs, thereby enhancing regional mobility and socio-economic development. The project provides seamless connectivity to key economic, social, and logistics nodes across Uttar Pradesh. Additionally, the upgraded corridor will enhance multi-modal integration by connecting with 03 Economic Nodes, 02 Social Nodes and 12 Logistic Nodes, providing enhanced multimodality with Rupaidiha Land Port and Airports thereby facilitating faster movement of goods and passengers across the region. Upon completion, the project will strategically establish a vital cross-border trade and transit corridor between India and Nepal via the Nepalganj border, significantly improving access to the Rupaidiha Land Port. It will enhance connectivity to remote districts such as Bahraich district and Shravasti district, support PM GatiShakti economic and logistics nodes, and stimulate agri-trade, tourism, cross-border commerce, and regional investment. Map of Corridor Project Details: Feature Details Project Name 4-Lane Access-Controlled National Highway-927 from Barabanki to Bahraich Corridor Lucknow &ndash; Rupaidiha Length (km) 101.515 Total Civil Cost (Rs Cr.) 3485.49 Land Acquisition Cost (Rs Cr.) 1574.85 Total Capital Cost (Rs Cr.) 6969.04 Mode Hybrid Annuity Mode (HAM) Bypasses 48.28 km Major Roads Connected National Highways &ndash; NH-27, , NH-330B and NH-730 State Highways &ndash; SH-13 and SH-30B Economic / Social / Transport Nodes Connected Airports: Lucknow & Sharavasti Railway Stations: Barabanki, Rasauli, Jangirabad, Rafinagar, Bindaura, Burhwal, Chowkaghat, Ghaghraghat, Jarwal and Bahraich Land Port: Rupaidiha Economic Nodes: 01 SEZ & 02 Mega Food Park Social Nodes: 02 Aspirational Districts. Major Cities / Towns Connected Barabanki, Ramnagar, Jarwal, Kaisargan, Kundasar, Fakharpur and Bahraich Employment Generation Potential 36.54 lakhs person-days (direct) & 43.04 lakh person-days (indirect) Annual Average Daily Traffic (AADT) in FY-28 Estimated at 28,557 (Package-1) and 21,270 (Package-2) Passenger Car Units (PCU) **** MJPS (Release ID: 2241794) Visitor Counter : 1551 Read this release in: Urdu , हिन्दी , Marathi , Bengali , Bengali-TR , Assamese , Manipuri , Punjabi , Gujarati , Odia , Tamil , Telugu , Kannada , Malayalam Cabinet Committee on Economic Affairs (CCEA) Cabinet approves construction of 4-Lane Access-Controlled National Highway-927 from Barabanki to Bahraich (101.515 km) in Uttar Pradesh on Hybrid Annuity Mode at a cost of Rs.6969.04 crore Posted On: 18 MAR 2026 4:10PM by PIB Delhi The Cabinet Committee on Economic Affairs chaired by the Prime Minister Shri Narendra Modi has approved construction of 4-Lane Access-Controlled National Highway-927 from Barabanki to Bahraich (101.515 km) in Uttar Pradesh on Hybrid Annuity Mode (HAM) at a cost of Rs.6969.04 crore. The proposed upgradation of the Barabanki&ndash;Bahraich section of NH-927 in Uttar Pradesh will address severe geometric deficiencies, sharp curves, and congestion in built-up areas across Barabanki and Bahraich district. Designed as an access-controlled 4-lane highway with continuous service roads, the project will bypass major habitations, increase average travel speeds, reduce travel time to about one hour, and improve overall road safety, fuel efficiency, and vehicle operating costs, thereby enhancing regional mobility and socio-economic development. The project provides seamless connectivity to key economic, social, and logistics nodes across Uttar Pradesh. Additionally, the upgraded corridor will enhance multi-modal integration by connecting with 03 Economic Nodes, 02 Social Nodes and 12 Logistic Nodes, providing enhanced multimodality with Rupaidiha Land Port and Airports thereby facilitating faster movement of goods and passengers across the region. Upon completion, the project will strategically establish a vital cross-border trade and transit corridor between India and Nepal via the Nepalganj border, significantly improving access to the Rupaidiha Land Port. It will enhance connectivity to remote districts such as Bahraich district and Shravasti district, support PM GatiShakti economic and logistics nodes, and stimulate agri-trade, tourism, cross-border commerce, and regional investment. Map of Corridor Project Details: Feature Details Project Name 4-Lane Access-Controlled National Highway-927 from Barabanki to Bahraich Corridor Lucknow &ndash; Rupaidiha Length (km) 101.515 Total Civil Cost (Rs Cr.) 3485.49 Land Acquisition Cost (Rs Cr.) 1574.85 Total Capital Cost (Rs Cr.) 6969.04 Mode Hybrid Annuity Mode (HAM) Bypasses 48.28 km Major Roads Connected National Highways &ndash; NH-27, , NH-330B and NH-730 State Highways &ndash; SH-13 and SH-30B Economic / Social / Transport Nodes Connected Airports: Lucknow & Sharavasti Railway Stations: Barabanki, Rasauli, Jangirabad, Rafinagar, Bindaura, Burhwal, Chowkaghat, Ghaghraghat, Jarwal and Bahraich Land Port: Rupaidiha Economic Nodes: 01 SEZ & 02 Mega Food Park Social Nodes: 02 Aspirational Districts. Major Cities / Towns Connected Barabanki, Ramnagar, Jarwal, Kaisargan, Kundasar, Fakharpur and Bahraich Employment Generation Potential 36.54 lakhs person-days (direct) & 43.04 lakh person-days (indirect) Annual Average Daily Traffic (AADT) in FY-28 Estimated at 28,557 (Package-1) and 21,270 (Package-2) Passenger Car Units (PCU) **** MJPS (Release ID: 2241794) <span style="font-size:16px"><span style="font-family:Times New Roman,Times,serif">The Cabinet Committee on Economic Affairs chaired by the Prime Minister Shri Narendra Modi has approved construction of 4-Lane Access-Controlled National Highway-927 from Barabanki to Bahraich (101.515 km) in Uttar Pradesh on Hybrid Annuity Mode (HAM) at a cost of Rs.6969.04 crore.</span></span></p> <p style="margin-left:0in; margin-right:1.15pt; text-align:justify"><span style="font-size:16px"><span style="font-family:Times New Roman,Times,serif">The proposed upgradation of the Barabanki&ndash;Bahraich section of NH-927 in Uttar Pradesh will address severe geometric deficiencies, sharp curves, and congestion in built-up areas across Barabanki and Bahraich district. Designed as an access-controlled 4-lane highway with continuous service roads, the project will bypass major habitations, increase average travel speeds, reduce travel time to about one hour, and improve overall road safety, fuel efficiency, and vehicle operating costs, thereby enhancing regional mobility and socio-economic development.</span></span></p> <p style="margin-left:0in; margin-right:1.15pt; text-align:justify"><span style="font-size:16px"><span style="font-family:Times New Roman,Times,serif">The project provides seamless connectivity to key economic, social, and logistics nodes across Uttar Pradesh. Additionally, the upgraded corridor will enhance multi-modal integration by connecting with 03 Economic Nodes, 02 Social Nodes and 12 Logistic Nodes, providing enhanced multimodality with Rupaidiha Land Port and Airports thereby facilitating faster movement of goods and passengers across the region. &nbsp;Upon completion, the project will strategically establish a vital cross-border trade and transit corridor between India and Nepal via the Nepalganj border, significantly improving access to the Rupaidiha Land Port. It will enhance connectivity to remote districts such as Bahraich district and Shravasti district, support PM GatiShakti economic and logistics nodes, and stimulate agri-trade, tourism, cross-border commerce, and regional investment.</span></span></p> <p style="margin-left:0in; margin-right:0in"><span style="font-size:16px"><span style="font-family:Times New Roman,Times,serif"><strong>Map of Corridor</strong></span></span></p> <p style="margin-left:0in; margin-right:0in; text-align:center"><img alt="" src="https://static.pib.gov.in/WriteReadData/userfiles/image/barabankitobaharichCCEA18032026JZOM.jpg" style="height:400px; width:600px" /></p> <p style="margin-left:0in; margin-right:0in; text-align:center">&nbsp;</p> <p style="margin-left:0in; margin-right:0in; text-align:justify"><span style="font-size:16px"><span style="font-family:Times New Roman,Times,serif"><strong><u>Project Details:</u></strong></span></span></p> <table border="1" cellspacing="0" class="MsoTableGrid" style="border-collapse:collapse; border:solid windowtext 1.0pt; width:447.65pt"> <tbody> <tr> <td style="width:169.85pt"> <p style="margin-left:0in; margin-right:0in; text-align:justify"><span style="font-size:16px"><span style="font-family:Times New Roman,Times,serif"><strong>Feature</strong></span></span></p> </td> <td style="width:277.8pt"> <p style="margin-left:0in; margin-right:0in; text-align:justify"><span style="font-size:16px"><span style="font-family:Times New Roman,Times,serif"><strong>Details</strong></span></span></p> </td> </tr> <tr> <td style="width:169.85pt"> <p style="margin-left:0in; margin-right:0in"><span style="font-size:16px"><span style="font-family:Times New Roman,Times,serif">Project Name</span></span></p> </td> <td style="width:277.8pt"> <p style="margin-left:0in; margin-right:0in"><span style="font-size:16px"><span style="font-family:Times New Roman,Times,serif">4-Lane Access-Controlled National Highway-927 from Barabanki to Bahraich </span></span></p> </td> </tr> <tr> <td style="width:169.85pt"> <p style="margin-left:0in; margin-right:0in"><span style="font-size:16px"><span style="font-family:Times New Roman,Times,serif">Corridor</span></span></p> </td> <td style="width:277.8pt"> <p style="margin-left:0in; margin-right:0in; text-align:justify"><span style="font-size:16px"><span style="font-family:Times New Roman,Times,serif">Lucknow &ndash; Rupaidiha</span></span></p> </td> </tr> <tr> <td style="width:169.85pt"> <p style="margin-left:0in; margin-right:0in"><span style="font-size:16px"><span style="font-family:Times New Roman,Times,serif">Length (km)</span></span></p> </td> <td style="width:277.8pt"> <p style="margin-left:0in; margin-right:0in"><span style="font-size:16px"><span style="font-family:Times New Roman,Times,serif">101.515</span></span></p> </td> </tr> <tr> <td style="width:169.85pt"> <p style="margin-left:0in; margin-right:0in"><span style="font-size:16px"><span style="font-family:Times New Roman,Times,serif">Total Civil Cost (Rs Cr.)</span></span></p> </td> <td style="width:277.8pt"> <p style="margin-left:0in; margin-right:0in"><span style="font-size:16px"><span style="font-family:Times New Roman,Times,serif">3485.49</span></span></p> </td> </tr> <tr> <td style="width:169.85pt"> <p style="margin-left:0in; margin-right:0in"><span style="font-size:16px"><span style="font-family:Times New Roman,Times,serif">Land Acquisition Cost (Rs Cr.)</span></span></p> </td> <td style="width:277.8pt"> <p style="margin-left:0in; margin-right:0in"><span style="font-size:16px"><span style="font-family:Times New Roman,Times,serif">1574.85</span></span></p> </td> </tr> <tr> <td style="width:169.85pt"> <p style="margin-left:0in; margin-right:0in"><span style="font-size:16px"><span style="font-family:Times New Roman,Times,serif">Total Capital Cost (Rs Cr.)</span></span></p> </td> <td style="width:277.8pt"> <p style="margin-left:0in; margin-right:0in"><span style="font-size:16px"><span style="font-family:Times New Roman,Times,serif">6969.04</span></span></p> </td> </tr> <tr> <td style="width:169.85pt"> <p style="margin-left:0in; margin-right:0in"><span style="font-size:16px"><span style="font-family:Times New Roman,Times,serif">Mode</span></span></p> </td> <td style="width:277.8pt"> <p style="margin-left:0in; margin-right:0in"><span style="font-size:16px"><span style="font-family:Times New Roman,Times,serif">Hybrid Annuity Mode (HAM)</span></span></p> </td> </tr> <tr> <td style="width:169.85pt"> <p style="margin-left:0in; margin-right:0in"><span style="font-size:16px"><span style="font-family:Times New Roman,Times,serif">Bypasses</span></span></p> </td> <td style="width:277.8pt"> <p style="margin-left:0in; margin-right:0in"><span style="font-size:16px"><span style="font-family:Times New Roman,Times,serif">48.28 km </span></span></p> </td> </tr> <tr> <td style="width:169.85pt"> <p style="margin-left:0in; margin-right:0in"><span style="font-size:16px"><span style="font-family:Times New Roman,Times,serif">Major Roads Connected</span></span></p> </td> <td style="width:277.8pt"> <p style="margin-left:0in; margin-right:0in"><span style="font-size:16px"><span style="font-family:Times New Roman,Times,serif">National Highways &ndash; NH-27, , NH-330B and NH-730</span></span></p> <p style="margin-left:0in; margin-right:0in"><span style="font-size:16px"><span style="font-family:Times New Roman,Times,serif">State Highways &ndash; SH-13 and SH-30B</span></span></p> </td> </tr> <tr> <td style="width:169.85pt"> <p style="margin-left:0in; margin-right:0in"><span style="font-size:16px"><span style="font-family:Times New Roman,Times,serif">Economic / Social / Transport Nodes Connected</span></span></p> </td> <td style="width:277.8pt"> <p style="margin-left:0in; margin-right:0in"><span style="font-size:16px"><span style="font-family:Times New Roman,Times,serif">Airports: Lucknow &amp; Sharavasti </span></span></p> <p style="margin-left:0in; margin-right:0in"><span style="font-size:16px"><span style="font-family:Times New Roman,Times,serif">Railway Stations: Barabanki, Rasauli, Jangirabad, Rafinagar, Bindaura, Burhwal, Chowkaghat, Ghaghraghat, Jarwal and Bahraich </span></span></p> <p style="margin-left:0in; margin-right:0in"><span style="font-size:16px"><span style="font-family:Times New Roman,Times,serif">Land Port: Rupaidiha </span></span></p> <p style="margin-left:0in; margin-right:0in; text-align:justify"><span style="font-size:16px"><span style="font-family:Times New Roman,Times,serif">Economic Nodes: 01 SEZ &amp; 02 Mega Food Park </span></span></p> <p style="margin-left:0in; margin-right:0in"><span style="font-size:16px"><span style="font-family:Times New Roman,Times,serif">Social Nodes: 02 Aspirational Districts.</span></span></p> </td> </tr> <tr> <td style="width:169.85pt"> <p style="margin-left:0in; margin-right:0in"><span style="font-size:16px"><span style="font-family:Times New Roman,Times,serif">Major Cities / Towns Connected</span></span></p> </td> <td style="width:277.8pt"> <p style="margin-left:0in; margin-right:0in"><span style="font-size:16px"><span style="font-family:Times New Roman,Times,serif">Barabanki, Ramnagar, Jarwal, Kaisargan, Kundasar, Fakharpur and Bahraich</span></span></p> </td> </tr> <tr> <td style="width:169.85pt"> <p style="margin-left:0in; margin-right:0in"><span style="font-size:16px"><span style="font-family:Times New Roman,Times,serif">Employment Generation Potential</span></span></p> </td> <td style="width:277.8pt"> <p style="margin-left:0in; margin-right:0in; text-align:justify"><span style="font-size:16px"><span style="font-family:Times New Roman,Times,serif">36.54 lakhs person-days (direct) &amp; 43.04 lakh person-days (indirect)</span></span></p> </td> </tr> <tr> <td style="width:169.85pt"> <p style="margin-left:0in; margin-right:0in"><span style="font-size:16px"><span style="font-family:Times New Roman,Times,serif">Annual Average Daily Traffic (AADT) in FY-28</span></span></p> </td> <td style="width:277.8pt"> <p style="margin-left:0in; margin-right:0in; text-align:justify"><span style="font-size:16px"><span style="font-family:Times New Roman,Times,serif">Estimated at 28,557 (Package-1) and 21,270 (Package-2) Passenger Car Units (PCU)</span></span></p> </td> </tr> </tbody> </table> <p style="margin-left:0in; margin-right:1.15pt; text-align:justify">&nbsp;</p> <p style="text-align:center"><span style="font-size:16px"><span style="font-family:Times New Roman,Times,serif">****</span></span></p> <p style="margin-left:0in; margin-right:0in"><strong><span style="font-size:16px"><span style="font-family:Times New Roman,Times,serif">MJPS</span></span></strong></p> " /> var mPlayer = document.getElementById("background_music"); var mPlayAction = document.getElementById("playbutton"); var isPlaying = false; function playAudio() { mPlayer.play(); isPlaying = true; document.getElementById('stopA').style.display = "block"; document.getElementById('playA').style.display = "none"; } function pauseAudio() { mPlayer.pause(); isPlaying = false; document.getElementById('playA').style.display = "block"; document.getElementById('stopA').style.display = "none"; } //function HandleAudio() { // if (isPlaying == true) { // //Playing already Pause it // pauseAudio(); // } else { // //Play the music // playAudio(); // } //} var synth = window.speechSynthesis; function CleanHtml(html) { html = html.replace(/ /gi, ''); return html; } function stripHtml(html) { let tmp = document.createElement("DIV"); tmp.innerHTML = CleanHtml(html); return tmp.textContent || tmp.innerText || ""; } $(document).ready(function () { //for responsive tables $("table").each(function () { if (!$(this).closest(".table-responsive").length) { $(this).wrap(" "); } }); var width = $(window).width(); if (width $(document).ready(function () { var width = $(window).width(); if (width @media print { .sticky-social, .sticky-social_mb, .pull-right, #printPDF { display: none !important; } } .f_vl { padding-right: 30px; font-size: 17px; cursor: pointer; } .log_oo { // width: 20%; display: flex; justify-content: space-between; } .log_oo img { width: 150px; /*width: 100%; height: auto;*/ } .sticky-social_mb { position: fixed; bottom: 0px; padding: 0px; margin: 0px; width: 100%; } .social_mb { list-style: none; display: flex; width: 100%; margin-bottom: -8px; } .social_mb a { padding: 8px 0px; font-size: 30px; transition: all 0.8s ease-in-out; width: 20% !important; text-align: center; } .section1 { position: relative; padding: 10px 0px; width: 100%; } .sticky-social { position: fixed; top: 20px; left: 0px; padding: 0px; margin: 0px; } .social { list-style: none; } .social a li { padding: 8px 12px; font-size: 25px; transition: all 0.8s ease-in-out; } .social a li:hover { margin-right: -30px; box-shadow: 2px 5px 10px grey; } .social a li:hover .fa { margin-left: 20px; } .fb_b { /* background-color: rgb(59, 89, 152);*/ background-color: rgba(65,103,178,255); } .twitter_r { /* background-color: rgb(29, 161, 242);*/ background-color: #000000; } .whatsapp_r { /* background-color: rgb(77, 194, 71);*/ background-color: rgba(13,191,67,255); } .fa-envelope_r { /* background-color: rgb(219, 68, 55);*/ background-color: #e2123d; } .fa-linkedin_r { background-color: rgb(0, 119, 181); }