Posted On: 12 MAR 2026 4:05PM by PIB Delhi The present installed nuclear power capacity in the country is 8,780 MW comprising of 24 nuclear power plants (excluding RAPS-1 – 100 MW). In addition, 18 nuclear power reactors with a total capacity of 13600 MW are under implementation, comprising of 8 nuclear reactors under construction (including PFBR – 500 MW) and 10 reactors under pre-project activities, which are expected to be completed progressively by 2031-32. In addition, as a part of the road map of the Nuclear Energy Mission (NEM) to reach 100 GW by 2047, three more projects KAPP-5&6 (2 X 700 MW), RAPP-9&10 (2 X 700 MW) and NAPP-3&4 (2 X 700 MW) are also planned by 2035. BHAVINI is currently commissioning a 500 MWe Prototype Fast Breeder Reactor (PFBR) project at Kalpakkam, Tamil Nadu. Government has accorded approval to carry out pre-project activities for 2 x 500 MWe twin unit of FBR 1&2 project at Kalpakkam, Tamil Nadu. On attaining first criticality of PFBR, Government will be approached for financial sanction of FBR 1&2 projects. The main reasons for cost overruns and delays in completion of projects in the recent past have been initial delays in land acquisition, R&R and obtaining various clearances and thereafter due to factors like delay in execution of works by contractors at site due to financial crunch / cash flow problems of contractors, shortage of skilled contractor manpower, the Covid 19 pandemic and implementation of recommended design changes following the Fukushima incident in Japan. As a waste management philosophy, no waste in any physical form is released/disposed to the environment unless the same is cleared, exempted or excluded from regulations. A comprehensive radioactive waste management is established taking into account the operational capability for the management of radioactive waste and an independent regulatory capability for its overview. Radioactive wastes generated at nuclear fuel cycle facilities, during their operation, are of low, intermediate and high activity level. Low and intermediate wastes are treated, concentrated, compacted, immobilized in solid materials like cement and disposed in engineered structures such as reinforced concrete trenches and tile holes, located at the site. High level wastes are immobilised in vitrified glass and stored in interim storage facility located at the site. The disposal/storage facilities are kept under constant surveillance as per the regulatory requirements approved by regulatory body. Environmental samples such as air, water, soil, vegetations, agricultural produces, milk, meat and other dietary products are collected periodically and analysed for radioactivity to assess the impact of storage/disposal of radioactive wastes. The practice is at par with international practices following the guidelines of International Atomic Energy Agency. The Sustainable Harnessing and Advancement of Nuclear Energy for Transforming India (SHANTI) Act, 2025, has been enacted and notified by the Ministry of Law and Justice on the 21st of December 2025 as a single, coherent legislation, with enabling provisions for private sector participation to carry out research and innovations for peaceful application of nuclear energy under license and safety authorization. Amendment to the FDI Policy on Atomic Energy sector to facilitate foreign investment in the nuclear sector is under consideration. This information was given by Union Minister of State (Independent Charge) for Science & Technology and Earth Sciences, and Minister of State in the Prime Minister’s Office, Personnel, Public Grievances and Pensions, Atomic Energy and Space, Dr. Jitendra Singh, in a written reply in the Rajya Sabha on Thursday. ***** NKR/AK (Release ID: 2238911) Visitor Counter : 1427 Read this release in: Urdu , हिन्दी Department of Atomic Energy PARLIAMENT QUESTION: NUCLEAR ENERGY PROJECTS Posted On: 12 MAR 2026 4:05PM by PIB Delhi The present installed nuclear power capacity in the country is 8,780 MW comprising of 24 nuclear power plants (excluding RAPS-1 – 100 MW). In addition, 18 nuclear power reactors with a total capacity of 13600 MW are under implementation, comprising of 8 nuclear reactors under construction (including PFBR – 500 MW) and 10 reactors under pre-project activities, which are expected to be completed progressively by 2031-32. In addition, as a part of the road map of the Nuclear Energy Mission (NEM) to reach 100 GW by 2047, three more projects KAPP-5&6 (2 X 700 MW), RAPP-9&10 (2 X 700 MW) and NAPP-3&4 (2 X 700 MW) are also planned by 2035. BHAVINI is currently commissioning a 500 MWe Prototype Fast Breeder Reactor (PFBR) project at Kalpakkam, Tamil Nadu. Government has accorded approval to carry out pre-project activities for 2 x 500 MWe twin unit of FBR 1&2 project at Kalpakkam, Tamil Nadu. On attaining first criticality of PFBR, Government will be approached for financial sanction of FBR 1&2 projects. The main reasons for cost overruns and delays in completion of projects in the recent past have been initial delays in land acquisition, R&R and obtaining various clearances and thereafter due to factors like delay in execution of works by contractors at site due to financial crunch / cash flow problems of contractors, shortage of skilled contractor manpower, the Covid 19 pandemic and implementation of recommended design changes following the Fukushima incident in Japan. As a waste management philosophy, no waste in any physical form is released/disposed to the environment unless the same is cleared, exempted or excluded from regulations. A comprehensive radioactive waste management is established taking into account the operational capability for the management of radioactive waste and an independent regulatory capability for its overview. Radioactive wastes generated at nuclear fuel cycle facilities, during their operation, are of low, intermediate and high activity level. Low and intermediate wastes are treated, concentrated, compacted, immobilized in solid materials like cement and disposed in engineered structures such as reinforced concrete trenches and tile holes, located at the site. High level wastes are immobilised in vitrified glass and stored in interim storage facility located at the site. The disposal/storage facilities are kept under constant surveillance as per the regulatory requirements approved by regulatory body. Environmental samples such as air, water, soil, vegetations, agricultural produces, milk, meat and other dietary products are collected periodically and analysed for radioactivity to assess the impact of storage/disposal of radioactive wastes. The practice is at par with international practices following the guidelines of International Atomic Energy Agency. The Sustainable Harnessing and Advancement of Nuclear Energy for Transforming India (SHANTI) Act, 2025, has been enacted and notified by the Ministry of Law and Justice on the 21st of December 2025 as a single, coherent legislation, with enabling provisions for private sector participation to carry out research and innovations for peaceful application of nuclear energy under license and safety authorization. Amendment to the FDI Policy on Atomic Energy sector to facilitate foreign investment in the nuclear sector is under consideration. This information was given by Union Minister of State (Independent Charge) for Science & Technology and Earth Sciences, and Minister of State in the Prime Minister’s Office, Personnel, Public Grievances and Pensions, Atomic Energy and Space, Dr. Jitendra Singh, in a written reply in the Rajya Sabha on Thursday. ***** NKR/AK (Release ID: 2238911) <span style="font-family:Times New Roman,Times,serif"><span style="font-size:16px">The present installed nuclear power capacity in the country is 8,780 MW comprising of 24 nuclear power plants (excluding RAPS-1 – 100 MW). In addition, 18 nuclear power reactors with a total capacity of 13600 MW are under implementation, comprising of 8 nuclear reactors under construction (including PFBR – 500 MW) and 10 reactors under pre-project activities, which are expected to be completed progressively by 2031-32. In addition, as a part of the road map of the Nuclear Energy Mission (NEM) to reach 100 GW by 2047, three more projects KAPP-5&6 (2 X 700 MW), RAPP-9&10 (2 X 700 MW) and NAPP-3&4 (2 X 700 MW) are also planned by 2035.</span></span></p> <p style="margin-left:0cm; margin-right:6.8pt; text-align:justify"><span style="font-family:Times New Roman,Times,serif"><span style="font-size:16px">BHAVINI is currently commissioning a 500 MWe Prototype Fast Breeder Reactor (PFBR) project at Kalpakkam, Tamil Nadu. Government has accorded approval to carry out pre-project activities for 2 x 500 MWe twin unit of FBR 1&2 project at Kalpakkam, Tamil Nadu. On attaining first criticality of PFBR, Government will be approached for financial sanction of FBR 1&2 projects.</span></span></p> <p style="margin-left:0cm; margin-right:6.95pt; text-align:justify"><span style="font-family:Times New Roman,Times,serif"><span style="font-size:16px">The main reasons for cost overruns and delays in completion of projects in the recent past have been initial delays in land acquisition, R&R and obtaining various clearances and thereafter due to factors like delay in execution of works by contractors at site due to financial crunch / cash flow problems of contractors, shortage of skilled contractor manpower, the Covid 19 pandemic and implementation of recommended design changes following the Fukushima incident in Japan.</span></span></p> <p style="margin-left:0cm; margin-right:6.85pt; text-align:justify"><span style="font-family:Times New Roman,Times,serif"><span style="font-size:16px">As a waste management philosophy, no waste in any physical form is released/disposed to the environment unless the same is cleared, exempted or excluded from regulations. A comprehensive radioactive waste management is established taking into account the operational capability for the management of radioactive waste and an independent regulatory capability for its overview. Radioactive wastes generated at nuclear fuel cycle facilities, during their operation, are of low, intermediate and high activity level. Low and intermediate wastes are treated, concentrated, compacted, immobilized in solid materials like cement and disposed in engineered structures such as reinforced concrete trenches and tile holes, located at the site. High level wastes are immobilised in vitrified glass and stored in interim storage facility located at the site. The disposal/storage facilities are kept under constant surveillance as per the regulatory requirements approved by regulatory body. Environmental samples such as air, water, soil, vegetations, agricultural produces, milk, meat and other dietary products are collected periodically and analysed for radioactivity to assess the impact of storage/disposal of radioactive wastes. The practice is at par with international practices following the guidelines of International Atomic Energy Agency.</span></span></p> <p style="text-align:justify"><span style="font-family:Times New Roman,Times,serif"><span style="font-size:16px">The Sustainable Harnessing and Advancement of Nuclear Energy for Transforming India (SHANTI) Act, 2025, has been enacted and notified by the Ministry of Law and Justice on the 21st of December 2025 as a single, coherent legislation, with enabling provisions for private sector participation to carry out research and innovations for peaceful application of nuclear energy under license and safety authorization. Amendment to the FDI Policy on Atomic Energy sector to facilitate foreign investment in the nuclear sector is under consideration.</span></span></p> <p style="margin-left:0cm; margin-right:1.15pt; text-align:justify"><span style="font-family:Times New Roman,Times,serif"><span style="font-size:16px">This information was given by Union Minister of State (Independent Charge) for Science & Technology and Earth Sciences, and Minister of State in the Prime Minister’s Office, Personnel, Public Grievances and Pensions, Atomic Energy and Space, Dr. Jitendra Singh, in a written reply in the Rajya Sabha on Thursday.</span></span></p> <p style="margin-left:30.2pt; text-align:center"><span style="font-family:Times New Roman,Times,serif"><span style="font-size:16px">*****</span></span></p> <p style="text-align:justify"><br /> <span style="font-family:Times New Roman,Times,serif"><span style="font-size:16px"><strong>NKR/AK</strong></span></span></p> " /> var mPlayer = document.getElementById("background_music"); var mPlayAction = document.getElementById("playbutton"); var isPlaying = false; function playAudio() { mPlayer.play(); isPlaying = true; document.getElementById('stopA').style.display = "block"; document.getElementById('playA').style.display = "none"; } function pauseAudio() { mPlayer.pause(); isPlaying = false; document.getElementById('playA').style.display = "block"; document.getElementById('stopA').style.display = "none"; } //function HandleAudio() { // if (isPlaying == true) { // //Playing already Pause it // pauseAudio(); // } else { // //Play the music // playAudio(); // } //} var synth = window.speechSynthesis; function CleanHtml(html) { html = html.replace(/ /gi, ''); return html; } function stripHtml(html) { let tmp = document.createElement("DIV"); tmp.innerHTML = CleanHtml(html); return tmp.textContent || tmp.innerText || ""; } $(document).ready(function () { //for responsive tables $("table").each(function () { if (!$(this).closest(".table-responsive").length) { $(this).wrap(" "); } }); var width = $(window).width(); if (width $(document).ready(function () { var width = $(window).width(); if (width @media print { .sticky-social, .sticky-social_mb, .pull-right, #printPDF { display: none !important; } } .f_vl { padding-right: 30px; font-size: 17px; cursor: pointer; } .log_oo { // width: 20%; display: flex; justify-content: space-between; } .log_oo img { width: 150px; /*width: 100%; height: auto;*/ } .sticky-social_mb { position: fixed; bottom: 0px; padding: 0px; margin: 0px; width: 100%; } .social_mb { list-style: none; display: flex; width: 100%; margin-bottom: -8px; } .social_mb a { padding: 8px 0px; font-size: 30px; transition: all 0.8s ease-in-out; width: 20% !important; text-align: center; } .section1 { position: relative; padding: 10px 0px; width: 100%; } .sticky-social { position: fixed; top: 20px; left: 0px; padding: 0px; margin: 0px; } .social { list-style: none; } .social a li { padding: 8px 12px; font-size: 25px; transition: all 0.8s ease-in-out; } .social a li:hover { margin-right: -30px; box-shadow: 2px 5px 10px grey; } .social a li:hover .fa { margin-left: 20px; } .fb_b { /* background-color: rgb(59, 89, 152);*/ background-color: rgba(65,103,178,255); } .twitter_r { /* background-color: rgb(29, 161, 242);*/ background-color: #000000; } .whatsapp_r { /* background-color: rgb(77, 194, 71);*/ background-color: rgba(13,191,67,255); } .fa-envelope_r { /* background-color: rgb(219, 68, 55);*/ background-color: #e2123d; } .fa-linkedin_r { background-color: rgb(0, 119, 181); } @media only screen and (max-device-width: 767px) { p span img { max-width: 90% !important; height: auto !important; } p img { max-width: 90% !important; height: auto !important; } h2 { font-size: 20px !important; font-weight: 600 !important; } h3 { font-size: 18px !important; font-weight: 600 !important; } } /* === Film Roll Badge Styling(IFFI2025 countdown) === */ .film-roll-badge { position: absolute; top:82%; right: 20px; width: 230px; height: 70px; background: repeating-linear-gradient( to right, #9a2375 0px, #9a2375 18px, #6e2b8b 18px, #6e2b8b 36px ); border-top: 8px solid #9a2375; border-bottom: 8px solid #9a2375; border-radius: 8px; overflow: hidden; box-shadow: 0 4px 12px rgba(0, 0, 0, 0.4); animation: moveFilm 8s linear infinite; z-index: 10; } /* film sprocket holes */ .film-roll-badge::before, .film-roll-badge::after { content: ""; position: absolute; width: 100%; height: 10px; background: repeating-linear-gradient( to right, #9a2375 0px, #9a2375 10px, #fff 10px, #fff 20px ); left: 0; z-index: 2; } .film-roll-badge::before { top: -4px; } .film-roll-badge::after { bottom: -4px; } .film-roll-inner { position: relative; height: 100%; display: flex; align-items: center; justify-content: center; animation: flicker 2s infinite ease-in-out; } .countdown-text { font-size: 1.3rem; font-weight: 700; color: #fff; text-shadow: 0 0 6px rgba(255, 255, 255, 0.4), 0 0 10px #000; white-space: nowrap; } /* === Animations === */ @keyframes moveFilm { 0% { background-position: 0 0; } 100% { background-position: 120px 0; } } @keyframes flicker { 0%, 100% { opacity: 1; } 50% { opacity: 0.9; } 25% { opacity: 0.95; } 75% { opacity: 0.85; } } /* === Responsive Adjustments === */ @media (max-width: 1500px) { .film-roll-badge { top: 68%; right: 18px; /* width: 220px; */ height: 65px; font-size: 0.85rem; } .press-section { margin-top: 35px; } } @media (max-width: 992px) { .film-roll-badge { top: 52%; right: 10px; width: 200px; height: 60px; } } @media (max-width: 768px) { .film-roll-badge { top: 56%; right: 10px; width: 124px; height: 55px; } .countdown-text { font-size: 0.9rem; } } @media (max-width: 576px) { .film-roll-badge { top: 59%; right: 5px; /* width: 160px; */ height: 50px; } .countdown-text { font-size: 0.85rem; } } const festivalStart = new Date("2025-11-20T00:00:00").getTime(); const festivalEnd = new Date("2025-11-28T23:59:59").getTime(); const countdownElement = document.getElementById("countdown"); const interval = setInterval(() => { const now = new Date().getTime(); // BEFORE FESTIVAL — show days + hours left if (now = festivalStart && now el.style.width = "350px"); clearInterval(interval); } }, 1000); //
PARLIAMENT QUESTION: NUCLEAR ENERGY PROJECTS
Original PIB release
pib.gov.in · PRID 2238911
Open on PIB ↗
pib.gov.in · PRID 2238911