Posted On: 03 MAR 2026 5:40PM by PIB Delhi NHAI has issued a Letter of Award (LOA) for the construction of the six-lane access-controlled Greenfield Capital Region Ring Road (Bhubaneswar Bypass) Project in Odisha. The project involves the development of a 111 km long Ring Road from Rameshwar to Tangi in three packages under the Hybrid Annuity Mode (HAM). The project is expected to be completed in about 30 months from the date of commencement. Package–I of the project has been awarded to M/s Patel Infrastructure Limited for the construction of a 40 km long six-lane section with paved shoulders from Rameshwar to Bilipada in Odisha. The project also includes the development of a 12.4 km long service road on each side, two interchanges, one ROB, 10 minor bridges, 142 culverts, one wayside amenity, seven elevated underpasses, and eight VUPs, LVUPs, and SVUPs. Package–II of the project has been awarded to M/s VRC Constructions (India) Limited for the construction of a 30 km long six-lane section with paved shoulders from Bilipada to Gobindpur in Odisha. The project also includes the development of a 7.2 km long service road on each side, three interchanges, 11 minor bridges, 90 culverts, one wayside amenity, three elevated underpasses, three VUPs, six LVUPs, and three SVUPs. Package–III of the project has been awarded to M/s HG Infra Engineering Limited for the construction of a 40 km long six-lane section with paved shoulders from Gobindpur to Tangi near Bandola Toll Plaza in the state of Odisha. The project also includes the development of a 10 km long service/slip road on each side, one interchange, 23 minor bridges, 69 culverts, one wayside amenity, two elevated underpasses, six VUPs, 16 LVUPs, and three SVUPs. With a design speed of 100 kmph, the Capital Region Ring Road (Bhubaneswar Bypass) is envisaged to significantly enhance regional connectivity and mobility by decongesting the urban areas of Bhubaneswar, Cuttack, and Khordha. The access-controlled corridor will boost regional connectivity, lower logistics costs, generate substantial employment, and support long-term economic growth while promoting safer, faster, and more sustainable travel across the region. ***** GDH/HJ (Release ID: 2235072) Visitor Counter : 2765 Read this release in: Urdu , हिन्दी , Telugu Ministry of Road Transport & Highways NHAI Awards Contract for Construction of Bhubaneswar Capital Region Ring Road Project Posted On: 03 MAR 2026 5:40PM by PIB Delhi NHAI has issued a Letter of Award (LOA) for the construction of the six-lane access-controlled Greenfield Capital Region Ring Road (Bhubaneswar Bypass) Project in Odisha. The project involves the development of a 111 km long Ring Road from Rameshwar to Tangi in three packages under the Hybrid Annuity Mode (HAM). The project is expected to be completed in about 30 months from the date of commencement. Package–I of the project has been awarded to M/s Patel Infrastructure Limited for the construction of a 40 km long six-lane section with paved shoulders from Rameshwar to Bilipada in Odisha. The project also includes the development of a 12.4 km long service road on each side, two interchanges, one ROB, 10 minor bridges, 142 culverts, one wayside amenity, seven elevated underpasses, and eight VUPs, LVUPs, and SVUPs. Package–II of the project has been awarded to M/s VRC Constructions (India) Limited for the construction of a 30 km long six-lane section with paved shoulders from Bilipada to Gobindpur in Odisha. The project also includes the development of a 7.2 km long service road on each side, three interchanges, 11 minor bridges, 90 culverts, one wayside amenity, three elevated underpasses, three VUPs, six LVUPs, and three SVUPs. Package–III of the project has been awarded to M/s HG Infra Engineering Limited for the construction of a 40 km long six-lane section with paved shoulders from Gobindpur to Tangi near Bandola Toll Plaza in the state of Odisha. The project also includes the development of a 10 km long service/slip road on each side, one interchange, 23 minor bridges, 69 culverts, one wayside amenity, two elevated underpasses, six VUPs, 16 LVUPs, and three SVUPs. With a design speed of 100 kmph, the Capital Region Ring Road (Bhubaneswar Bypass) is envisaged to significantly enhance regional connectivity and mobility by decongesting the urban areas of Bhubaneswar, Cuttack, and Khordha. The access-controlled corridor will boost regional connectivity, lower logistics costs, generate substantial employment, and support long-term economic growth while promoting safer, faster, and more sustainable travel across the region. ***** GDH/HJ (Release ID: 2235072) <span style="font-family:Times New Roman,Times,serif"><span style="font-size:16px">NHAI has issued a Letter of Award (LOA) for the construction of the six-lane access-controlled Greenfield Capital Region Ring Road (Bhubaneswar Bypass) Project in Odisha. The project involves the development of a 111 km long Ring Road from Rameshwar to Tangi in three packages under the Hybrid Annuity Mode (HAM). The project is expected to be completed in about 30 months from the date of commencement.</span></span></p> <p style="text-align:justify"><span style="font-family:Times New Roman,Times,serif"><span style="font-size:16px">Package–I of the project has been awarded to M/s Patel Infrastructure Limited for the construction of a 40 km long six-lane section with paved shoulders from Rameshwar to Bilipada in Odisha. The project also includes the development of a 12.4 km long service road on each side, two interchanges, one ROB, 10 minor bridges, 142 culverts, one wayside amenity, seven elevated underpasses, and eight VUPs, LVUPs, and SVUPs.</span></span></p> <p style="text-align:justify"><span style="font-family:Times New Roman,Times,serif"><span style="font-size:16px">Package–II of the project has been awarded to M/s VRC Constructions (India) Limited for the construction of a 30 km long six-lane section with paved shoulders from Bilipada to Gobindpur in Odisha. The project also includes the development of a 7.2 km long service road on each side, three interchanges, 11 minor bridges, 90 culverts, one wayside amenity, three elevated underpasses, three VUPs, six LVUPs, and three SVUPs.</span></span></p> <p style="text-align:justify"><span style="font-family:Times New Roman,Times,serif"><span style="font-size:16px">Package–III of the project has been awarded to M/s HG Infra Engineering Limited for the construction of a 40 km long six-lane section with paved shoulders from Gobindpur to Tangi near Bandola Toll Plaza in the state of Odisha. The project also includes the development of a 10 km long service/slip road on each side, one interchange, 23 minor bridges, 69 culverts, one wayside amenity, two elevated underpasses, six VUPs, 16 LVUPs, and three SVUPs.</span></span></p> <p style="text-align:justify"><span style="font-family:Times New Roman,Times,serif"><span style="font-size:16px">With a design speed of 100 kmph, the Capital Region Ring Road (Bhubaneswar Bypass) is envisaged to significantly enhance regional connectivity and mobility by decongesting the urban areas of Bhubaneswar, Cuttack, and Khordha. The access-controlled corridor will boost regional connectivity, lower logistics costs, generate substantial employment, and support long-term economic growth while promoting safer, faster, and more sustainable travel across the region.</span></span></p> <p style="text-align:center"><span style="font-family:Times New Roman,Times,serif"><span style="font-size:16px">*****</span></span></p> <p style="text-align:justify"><strong><span style="font-family:Times New Roman,Times,serif"><span style="font-size:16px">GDH/HJ</span></span></strong></p> " /> var mPlayer = document.getElementById("background_music"); var mPlayAction = document.getElementById("playbutton"); var isPlaying = false; function playAudio() { mPlayer.play(); isPlaying = true; document.getElementById('stopA').style.display = "block"; document.getElementById('playA').style.display = "none"; } function pauseAudio() { mPlayer.pause(); isPlaying = false; document.getElementById('playA').style.display = "block"; document.getElementById('stopA').style.display = "none"; } //function HandleAudio() { // if (isPlaying == true) { // //Playing already Pause it // pauseAudio(); // } else { // //Play the music // playAudio(); // } //} var synth = window.speechSynthesis; function CleanHtml(html) { html = html.replace(/ /gi, ''); return html; } function stripHtml(html) { let tmp = document.createElement("DIV"); tmp.innerHTML = CleanHtml(html); return tmp.textContent || tmp.innerText || ""; } $(document).ready(function () { //for responsive tables $("table").each(function () { if (!$(this).closest(".table-responsive").length) { $(this).wrap(" "); } }); var width = $(window).width(); if (width $(document).ready(function () { var width = $(window).width(); if (width @media print { .sticky-social, .sticky-social_mb, .pull-right, #printPDF { display: none !important; } } .f_vl { padding-right: 30px; font-size: 17px; cursor: pointer; } .log_oo { // width: 20%; display: flex; justify-content: space-between; } .log_oo img { width: 150px; /*width: 100%; height: auto;*/ } .sticky-social_mb { position: fixed; bottom: 0px; padding: 0px; margin: 0px; width: 100%; } .social_mb { list-style: none; display: flex; width: 100%; margin-bottom: -8px; } .social_mb a { padding: 8px 0px; font-size: 30px; transition: all 0.8s ease-in-out; width: 20% !important; text-align: center; } .section1 { position: relative; padding: 10px 0px; width: 100%; } .sticky-social { position: fixed; top: 20px; left: 0px; padding: 0px; margin: 0px; } .social { list-style: none; } .social a li { padding: 8px 12px; font-size: 25px; transition: all 0.8s ease-in-out; } .social a li:hover { margin-right: -30px; box-shadow: 2px 5px 10px grey; } .social a li:hover .fa { margin-left: 20px; } .fb_b { /* background-color: rgb(59, 89, 152);*/ background-color: rgba(65,103,178,255); } .twitter_r { /* background-color: rgb(29, 161, 242);*/ background-color: #000000; } .whatsapp_r { /* background-color: rgb(77, 194, 71);*/ background-color: rgba(13,191,67,255); } .fa-envelope_r { /* background-color: rgb(219, 68, 55);*/ background-color: #e2123d; } .fa-linkedin_r { background-color: rgb(0, 119, 181); } @media only screen and (max-device-width: 767px) { p span img { max-width: 90% !important; height: auto !important; } p img { max-width: 90% !important; height: auto !important; } h2 { font-size: 20px !important; font-weight: 600 !important; } h3 { font-size: 18px !important; font-weight: 600 !important; } } /* === Film Roll Badge Styling(IFFI2025 countdown) === */ .film-roll-badge { position: absolute; top:82%; right: 20px; width: 230px; height: 70px; background: repeating-linear-gradient( to right, #9a2375 0px, #9a2375 18px, #6e2b8b 18px, #6e2b8b 36px ); border-top: 8px solid #9a2375; border-bottom: 8px solid #9a2375; border-radius: 8px; overflow: hidden; box-shadow: 0 4px 12px rgba(0, 0, 0, 0.4); animation: moveFilm 8s linear infinite; z-index: 10; } /* film sprocket holes */ .film-roll-badge::before, .film-roll-badge::after { content: ""; position: absolute; width: 100%; height: 10px; background: repeating-linear-gradient( to right, #9a2375 0px, #9a2375 10px, #fff 10px, #fff 20px ); left: 0; z-index: 2; } .film-roll-badge::before { top: -4px; } .film-roll-badge::after { bottom: -4px; } .film-roll-inner { position: relative; height: 100%; display: flex; align-items: center; justify-content: center; animation: flicker 2s infinite ease-in-out; } .countdown-text { font-size: 1.3rem; font-weight: 700; color: #fff; text-shadow: 0 0 6px rgba(255, 255, 255, 0.4), 0 0 10px #000; white-space: nowrap; } /* === Animations === */ @keyframes moveFilm { 0% { background-position: 0 0; } 100% { background-position: 120px 0; } } @keyframes flicker { 0%, 100% { opacity: 1; } 50% { opacity: 0.9; } 25% { opacity: 0.95; } 75% { opacity: 0.85; } } /* === Responsive Adjustments === */ @media (max-width: 1500px) { .film-roll-badge { top: 68%; right: 18px; /* width: 220px; */ height: 65px; font-size: 0.85rem; } .press-section { margin-top: 35px; } } @media (max-width: 992px) { .film-roll-badge { top: 52%; right: 10px; width: 200px; height: 60px; } } @media (max-width: 768px) { .film-roll-badge { top: 56%; right: 10px; width: 124px; height: 55px; } .countdown-text { font-size: 0.9rem; } } @media (max-width: 576px) { .film-roll-badge { top: 59%; right: 5px; /* width: 160px; */ height: 50px; } .countdown-text { font-size: 0.85rem; } } const festivalStart = new Date("2025-11-20T00:00:00").getTime(); const festivalEnd = new Date("2025-11-28T23:59:59").getTime(); const countdownElement = document.getElementById("countdown"); const interval = setInterval(() => { const now = new Date().getTime(); // BEFORE FESTIVAL — show days + hours left if (now = festivalStart && now el.style.width = "350px"); clearInterval(interval); } }, 1000); //
NHAI Awards Contract for Construction of Bhubaneswar Capital Region Ring Road Project
Original PIB release
pib.gov.in · PRID 2235072
Open on PIB ↗
pib.gov.in · PRID 2235072