TDB signs ₹10 crore RDI deal for critical-metal recycling
The Technology Development Board has signed an agreement with Neo Seekermetals of Hyderabad under the RDI Fund: ₹10 crore of a ₹20 crore project to recover critical metals from e-waste and lithium-ion battery waste.
What happened
- The Technology Development Board (DST) signed an agreement with Neo Seekermetals Pvt. Ltd., Hyderabad, under the RDI Fund.
- The project is Extraction of Critical Metals by Recycling of E-Waste and Lithium-Ion Battery Waste, with a total cost of ₹20 crore and ₹10 crore approved under the RDI Fund.
- The support is Optionally Convertible Debt (OCD).
- The patented process aims to recover critical metals and battery materials from e-waste and lithium-ion battery waste.
- The target is to take the technology from TRL-5 to TRL-9, towards commercial-scale deployment.
For Prelims
- RDI Scheme: launched on 3 November 2025 with an outlay of ₹1 lakh crore over six years to bring private capital into research and development, including energy transition and deep technology (PRIDs 2238916, 2245233).
- Two tiers: a Special Purpose Fund within the Anusandhan National Research Foundation (ANRF) is the first-level custodian, and the Technology Development Board and BIRAC are Second-Level Fund Managers (PRIDs 2241755, 2245233; DST Annual Report 2025-26).
- TDB: a statutory body under the Department of Science & Technology that finances the commercial application of indigenous technology (DST Annual Reports 2025 and 2025-26).
- First call: TDB issued its RDI call for proposals on 4 February 2026 and BIRAC on 13 February 2026 (PRIDs 2238346, 2238916).
- Instrument and target: TDB's RDI agreements of 26 October (Manastu Space) and 12 November (Astrome) also use Optionally Convertible Debt and also aim for TRL-9 (PRIDs 2328399, 2335322).
- Recycling scheme: the Ministry of Mines' incentive scheme for promotion of critical mineral recycling carries ₹1,500 crore under the National Critical Mineral Mission (PRIDs 2256977, 2335019).
- Sector labels: TDB's RDI release of 12 November classed its project by sector and sub-sector (Deep Technology; Space Technology), while the scheme names energy security, energy transition and deep technologies as targets (PRIDs 2335322, 2238916). Today's release gives no such label.
- Cost share: ₹10 crore of ₹20 crore is half the project cost, so the other half must come from the company or other sources (arithmetic on the release).
For UPSC: TDB (DST) + Neo Seekermetals, Hyderabad: ₹20 crore project, ₹10 crore from RDI Fund as optionally convertible debt; TRL-5 to TRL-9; e-waste and lithium-ion battery recycling.
What it is NOT: The release gives no recovery rate, plant capacity, list of metals, site or timeline, and no date for disbursement. It does not say how the debt converts or is repaid, who funds the other ₹10 crore, or which sector label the project carries under the RDI Fund. It does not link the project to the Ministry of Mines' recycling scheme or to any feedstock supply.
For Mains
Syllabus: GS3.12 · GS3.14 · Linkage L1
Anchor
India's electric vehicles, storage plants and electronics will raise demand for critical minerals, and much of that demand is met by imports. Waste is a second source: batteries and circuit boards hold metals that a recycling plant can return to industry. This agreement backs one company's attempt to do that at scale.
Substantiation (data)
TDB is putting ₹10 crore into a ₹20 crore project, half the cost, as optionally convertible debt, with a target of TRL-5 to TRL-9. TDB's agreements with Manastu Space (26 October) and Astrome (12 November) use the same instrument and the same TRL-9 goal, which shows a pattern of funding late-stage technology rather than first ideas.
Position
TDB's mandate to finance commercial application of indigenous technology fits a recycling process that works in a laboratory and needs a plant. The RDI Fund routes money through second-level managers, and the Ministry of Mines' ₹1,500 crore recycling scheme backs the same sector from the demand side.
Counterpoint
The release gives no capacity, recovery rate, metals list or customer. A patented process at TRL-5 has not yet been shown at commercial scale, and what happens to the state's stake if the project falls short is not described. Feedstock supply, the usual constraint for recyclers, is not addressed.
Way forward
Publish milestones against TRL levels, report recovery rates for each metal, tie support to collection and formal feedstock, and link TDB projects with the Mines Ministry's recycling scheme so that a plant funded under one has demand under the other.
Conclusion
One ₹10 crore agreement does not change India's mineral balance. It is a test of whether RDI money is reaching recycling and whether the first projects show recovery at plant scale.
Deploys into: Critical minerals and the circular economy · E-waste and battery waste management · Quasi-equity support for deep technology · Technology readiness levels
Ministry of Science & Technology · 2026-11-16 · PRID 2336782 · PIB source ↗